Making all 4 of my mopeds run AT THE SAME TIME (at the same time <> simultaneously). To do that, I need to make one work period, I need to make one not run temporarily before I can make it run again better than before (hopefully), and by making it not run temporarily, I will have the pieces to make another one run, and in the meantime, I have to not seize my new kit.